Agapiou, A, Price, A D F and McCaffer, R (1995) Forecasting the supply of construction skills in the UK. Construction Management and Economics, 13(04), 353-64.

Alkass, S, Mazerolle, M, Tribaldos, E and Harris, F C (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(04), 335-52.

Ball, M and Wood, A (1995) How many jobs does construction expenditure generate?. Construction Management and Economics, 13(04), 307-18.

Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(04), 319-33.

  • Type: Journal Article
  • Keywords: case study; Hong Kong; productivity; schedule; time
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446199500000037
  • Abstract:

    This is the second phase of an investigation into the significant factors influencing construction duration of projects in Hong Kong. The results of the first phase led to the conclusion that larger samples were justified to investigate further the discerned relationships. Expanded samples were obtained in this second phase by adding some reported data from Hong Kong projects to the original surveyed sample. The second phase of this study also further investigates the relationships between different project characteristic variables such as the construction duration, construction cost, total gross floor area and the number of storeys in the case of buildings. Moreover, a case study on plant utilization level and site labour productivity was carried out on a building site to explore the ’micro-factors’ that affect construction durations. The findings are of importance to all construction industry participants as the derived models help to estimate the construction duration of a project on the basis of significant macro project parameters. Additionally, the results of the case study indicate the contribution of significantly variable site productivity levels to overall construction duration and suggest an agenda for future investigations. A third phase of this study is planned incorporating more detailed data collection and analysis of significant factors, as well as international comparisons where possible.

Griffith, A and Headley, J D (1995) Developing an effective approach to the procurement and management of small building works within large client organizations. Construction Management and Economics, 13(04), 279-89.

Kapliński, O and Thiel, T (1995) Evaluation of multi-family housing systems in Poland. Construction Management and Economics, 13(04), 291-8.

Salminen, S (1995) Serious occupational accidents in the construction industry. Construction Management and Economics, 13(04), 299-306.